Home ProductsIron Casting Parts

Machine wheel part ductile iron casting parts according to drawing

Certifications
Good quality Stainless Steel Casting Parts for sales
Good quality Stainless Steel Casting Parts for sales
I'm Online Chat Now

Machine wheel part ductile iron casting parts according to drawing

China Machine wheel part  ductile iron casting parts according to drawing supplier

Large Image :  Machine wheel part ductile iron casting parts according to drawing

Product Details:

Place of Origin: China
Brand Name: wheel part
Certification: ISO9001, TS16949
Model Number: Ottommo-ductile iron-002

Payment & Shipping Terms:

Minimum Order Quantity: 760 pcs
Price: according to drawing
Packaging Details: parts in carton, cartons in pallet
Delivery Time: 20-25 working days after PO
Supply Ability: 10000 pcs per month
Contact Now
Detailed Product Description
Material: Ductile Iron 450-10 Hardness: 180-210HB Or According To Drawing
Heat Treatment: Quenching Or According To Drawing And Customer Requirements Surface Treatment: According To Drawing And Customer Requirements
Lead Time: 20-25 Working Days After PO Package: Carton And Pallet

wheel part

Machine wheel part ductile iron casting parts according to drawing

Description

The procedure of this part is wax mould, shell mold, pouring, after treatment and packaging, whose lead time will be 20-25 working days after PO received.

 

Item Description
Product Name wheel part
Working Process Tooling make, wax mould, shell mould, pouring, cut and grind gate, shoot blast, after treatment, testing, packaging
Material ductile iron 450-10
Surface Treatment According to the requirement of customer
Application(Products cope) into the machine
Quality Control ISO9001, TS16949
Thickness Only to raw casting, more than 4mm
File Format Solidworks,Pro/Engineer,Auto CAD,PDF,JPG
Service 24-hour reply to customer's enquiry
Inspection IQC, IPQC,FQC,QA
Mould Depend on customer's require to make the mould.
Sample confirmation Before start mass production we will send the pre-production samples to customer for confirmation.We will modify the mould until customer satisfied.
Packing Inner Plastic Bag; Outer Standard Carton Box,Or according to customer's requirements

 

Payment & Shipping Terms:

Minimum Order Quantity: 760
Price: Quoted per see the drawing or sample
Delivery Time: 20-25 working days after received PO
Payment Terms: T/T, L/C
Supply Ability: 10,000pcs per month

 

FAQ:

 

Q: What is the payment?

We prefer T/T, and also L/C if you want, the way of payment we can discuss.

 

Q: What is the lead time?

1. If we will start this project, we will start the tooling make and samples, which will be about 40-45 days after we received the PO.

2. If do the mass production, the lead time will be with 20 working days after receiving the PO.

 

GOOD SERVICE:

We will respond to you within 24 hours. We can manufacture nonstandard parts according to your drawings. And we offer best after sale service.

 

LOWER PRICE:

The price of our products is reasonable and competitive, and we can discuss if you want.

 

PERFECT QUALITY:

We have strict quality control from producing to delivery. Our company had strong technology support. We have cultivated a group of managers who are familiar with product quality , good at modern concept of management .

 

Strict inspection we do during operation

1. We have specialized QC testers to check the products quality according to different customers.

2. We have IQC to check the dimensions and surface of the incoming material.

3. We have PQC to inspect full-course during the processing

4. We have FQC to inspect all the plating products from outsides and make the 100% inspection before the shipments

5. We are willing to provide with sample for quality and function testing. We are a certified firm with TS16949. Our products are excellent in quality and reasonable in price.

 

How to test the part?

1. When we do the wax mould, we will choose 5-10 parts to test the wax shrinkage, and also test the life of toolings.

2. Before pouring, we will test the material and do the material report.

3. After Pouring, we will choose 10-20 parts per furnace to do the measurement.

4. When doing the after treatment, we will measure some of the parts per day.

5. After after-treatment, we will use testing toolings to test every parts.

6. Before shippment, we will test 5 parts or the quantity customer want to do the report, and will send the material report and meausrement report together with productions to customer.

Contact Details
Ningbo Ottommo Casting Co., Ltd

Contact Person: k.wang

Send your inquiry directly to us (0 / 3000)