Home ProductsIron Casting Parts

03 joint iron 450-10 ductile iron fittings heat treatment metal casting parts

Certifications
Good quality Stainless Steel Casting Parts for sales
Good quality Stainless Steel Casting Parts for sales
I'm Online Chat Now

03 joint iron 450-10 ductile iron fittings heat treatment metal casting parts

China 03 joint iron 450-10 ductile iron fittings heat treatment metal casting parts supplier

Large Image :  03 joint iron 450-10 ductile iron fittings heat treatment metal casting parts

Product Details:

Place of Origin: China
Brand Name: 03 joint part
Certification: ISO9001, TS16949
Model Number: Ottommo-ductile iron-019

Payment & Shipping Terms:

Minimum Order Quantity: 560 pcs
Price: according to drawing
Packaging Details: parts in carton, cartons in pallet
Delivery Time: 20-25 working days after PO
Supply Ability: 10000 pcs per month
Contact Now
Detailed Product Description
Material: Ductile Iron 450-10 Hardness: 180-210HB Or According To Drawing
Heat Treatment: Quenching Or According To Drawing And Customer Requirements Surface Treatment: According To Drawing And Customer Requirements
Lead Time: 20-25 Working Days After PO Package: Carton And Pallet

03 joint part

03 joint iron 450-10 ductile iron fittings heat treatment metal casting parts

Description

The procedure of this part is wax mould, shell mold, pouring, after treatment and packaging, whose lead time will be 20-25 working days after PO received.

 

Item Description
Product Name 03 joint part
Working Process Tooling make, wax mould, shell mould, pouring, cut and grind gate, shoot blast, after treatment, testing, packaging
Material ductile iron 450-10
Surface Treatment According to the requirement of customer
Application(Products cope) machine, joint, connect with some parts
Quality Control ISO9001, TS16949
Thickness Only to raw casting, more than 4mm
File Format Solidworks,Pro/Engineer,Auto CAD,PDF,JPG
Service 24-hour reply to customer's enquiry
Inspection IQC, IPQC,FQC,QA
Mould Depend on customer's require to make the mould.
Sample confirmation Before start mass production we will send the pre-production samples to customer for confirmation.We will modify the mould until customer satisfied.
Packing Inner Plastic Bag; Outer Standard Carton Box,Or according to customer's requirements

 

Payment & Shipping Terms:

Minimum Order Quantity: 560
Price: Quoted per see the drawing or sample
Delivery Time: 20-25 working days after received PO
Payment Terms: T/T, L/C
Supply Ability: 10,000pcs per month

 

FAQ:

 

Q: What is the payment?

We prefer T/T, and also L/C if you want, the way of payment we can discuss.

 

Q: What is the lead time?

1. If we will start this project, we will start the tooling make and samples, which will be about 40-45 days after we received the PO.

2. If do the mass production, the lead time will be with 20 working days after receiving the PO.

 

LOWER PRICE:

The price of our products is reasonable and competitive, and we can discuss if you want.

 

PERFECT QUALITY:

We have strict quality control from producing to delivery. Our company had strong technology support. We have cultivated a group of managers who are familiar with product quality , good at modern concept of management .

 

Why should you choose us?

1. We can do the part according to your drawing.

2. Rich experience and good technology support ( with senior and professional engineers with more than 7 years experience).

3. 100% inspection before delivery.

4. Competitive price with high quality.

5. Convenient transportation ( port: Ningbo, Shanghai)

6. Better operators in the office doing the export, who have done export business for more than 10 years, have good relationship with custom and shipping companies.

 

Strict inspection we do during operation

1. We have specialized QC testers to check the products quality according to different customers.

2. We have IQC to check the dimensions and surface of the incoming material.

3. We have PQC to inspect full-course during the processing

4. We have FQC to inspect all the plating products from outsides and make the 100% inspection before the shipments

5. We are willing to provide with sample for quality and function testing. We are a certified firm with TS16949. Our products are excellent in quality and reasonable in price.

 

How to test the part?

1. When we do the wax mould, we will choose 5-10 parts to test the wax shrinkage, and also test the life of toolings.

2. Before pouring, we will test the material and do the material report.

3. After Pouring, we will choose 10-20 parts per furnace to do the measurement.

4. When doing the after treatment, we will measure some of the parts per day.

5. After after-treatment, we will use testing toolings to test every parts.

6. Before shippment, we will test 5 parts or the quantity customer want to do the report, and will send the material report and meausrement report together with productions to customer.

Contact Details
Ningbo Ottommo Casting Co., Ltd

Contact Person: k.wang

Send your inquiry directly to us (0 / 3000)